Need a bit of coaching.... Im new to Fitting and am doing a job... I feel like im getting ripped off since the new vault changes... im charging 500 cp per iron sheet joint... i make one trip to their location that chews up 130cp and i only get to place 3 to 4 sheets per trip... just dont know if im doing this right or not... any suggestions?
Thanks in advance folks!