So I was working on a Tier VI construction project when I found out that there is almost no feasiable way for me to get efficient at advaced construction units. I looked in to this further and realized the difference was 325 points between min and Optimum whereas its 275 in the rest of the tiers. This is not fair. It makes tier VI crafting that much more of a grind beyond the transmutation requirements and overall that much more frustrating. Its just unfair to impose this on us so that we have to work longer on a project to get it done.
Please adjust the difference to 275 points at least until the cap is raised.